Well, I'm pretty caught up with indoor jobs. Now I need the weather to break. If it snows or rains any more, I'll be able to do the shake down cruise in my front yard!
Anyway, now is a good time to go through the list of stuff that needs to be done.
(I'm even gonna try doing this in some kind of category order)
Electrical:- Wire the anchor light
- Wire the running lights
- Wire the horn
- Wire the cabin light
- Wire the bilge pump
- Install battery mounts
|
Rigging:- Install the tiller lock
- Organize lines
|
Appearance:- Fill the holes in the deck
- Install portholes
- Paint hull and deck
- Install rails on cuddy cabin (Not sure about this)
|
General:- Remount the centerboard
- Find a compass that will mount
- Re-Christen her
|
Future plans:- Order replacement cushions for cabin
- Make tent for cockpit area
- Jib furling system (maybe when I replace the jib sail)
|